European Manufacturer's Nearshore Control Tower
European Manufacturer's Nearshore Control Tower is a medium Kearney tech consulting case interview that runs 25-35 min. A European industrial OEM — €3.4B revenue, plants in Germany and northern Italy — is moving 30% of final assembly to Poland and Portugal over 24 months to cut energy and labor cost. A strong answer works through 5 phases: Define the control tower by the decision it changes; Baseline the €46M: how much is forecast error, supplier lateness, and plant inflexibility; Pick the data scope that a mid-size supplier will actually send; Choose build vs buy against the 24-month move: a thin tower on the existing ERP vs a new planning platform; Set the KPI bridge.
Last updated 2026-09-05
The brief
A European industrial OEM — €3.4B revenue, plants in Germany and northern Italy — is moving 30% of final assembly to Poland and Portugal over 24 months to cut energy and labor cost. Planning still runs on a weekly MRP export and email. Inbound freight expedites cost €46M last year. The COO wants a 'digital control tower' before the first line moves, and has €8M and two planners' worth of patience. Suppliers are mid-size and will not join a portal that takes a quarter to learn. You advise on what to build, what to buy, and which number has to move.
How to approach it
- Define the control tower by the decision it changes — expedite, reallocate a shortage, slip a customer — not by a software category
- Baseline the €46M: how much is forecast error, supplier lateness, and plant inflexibility
- Pick the data scope that a mid-size supplier will actually send — ASN and inventory, not a full planning collaboration suite
- Choose build vs buy against the 24-month move: a thin tower on the existing ERP vs a new planning platform
- Set the KPI bridge — expedite cost, schedule adherence, inventory at the new plants — and the week-1 process with the planners
What a strong answer does
- Anchors the tower to expedite cost and the Poland/Portugal ramp, not a vision deck
- Designs for suppliers who live in email and EDI, with a fallback that does not stall the move
- Refuses a 18-month APS implementation that lands after the lines have moved
- Gives planners a daily exception list rather than another dashboard
- Splits €8M into integration, a small license, and the process change — and says what is out of scope
Red flags interviewers score down
- Recommends a full supply-chain cloud suite before the first ASN is reliable
- Ignores supplier adoption and assumes API connectivity
- Measures success as 'tower deployed' with no expedite or service number
- Centralizes planning in a way that blinds the new plants